Create 15 or more decomposed work packages into 4 levels that are assigned to 5 or more main tasks (75 line items).
• Ensure the main WBS tasks headings are the 5 PMBOK® process areas (Initiating, Planning, Executing, Monitoring& Controlling and Closing)
• Create a Work Breakdown Structure Code for each task. (as seen in above example)
• Determine an overall project duration and duration estimates for each of the tasks. The duration is not to exceed 90 days.
• Create accurate work package assumptions and duration estimates.
• Include 7 resources assigned in the Resource Sheet as “Work” types and 3 resources assigned as “ Material” types.
• Ensure the Resources are paid no more than $30/hour and that the “Material” cost per use will not exceed $50.
• Include your resources and materials from the Resource Sheet in the task sheet.
• Create 10 dependencies in the Task Sheet